Thank you for your patience while we retrieve your images.
Visitors 373
Modified 12-Nov-24
Created 13-Mar-12
6 photos

Bo-Bo 3rd Rail Electric/Diesel Electric (Electro Diesel) producing 1420HP when operating on 660 - 750v dc current, or 600HP when under Diesel Power, built by BR's Eastleigh Works with English Electric as the main contractor. Originally designated Class 72 under Tops but this changed to 73 and 72 was not carried.

73004-Y-Basingstoke-030488-JC976

73004-Y-Basingstoke-030488-JC976

73004-Y-Basingstoke-030488-JC977

73004-Y-Basingstoke-030488-JC977

73006-Y-CreweBasfordHall-200894-RPC959

73006-Y-CreweBasfordHall-200894-RPC959

E6001-Guildford-180770-GE473

E6001-Guildford-180770-GE473

E6003 Loughborough, 230505 JC0011

E6003 Loughborough, 230505 JC0011

E6046 Petts Wood 211268 AWN046

E6046 Petts Wood 211268 AWN046

Categories & Keywords
Category:Transportation
Subcategory:Railway
Subcategory Detail:
Keywords:1420HP, 4SRKT, 750V DC, Bo-Bo, British Railways, Class 73, Class 73/0, Diesel Electric, Eastleigh Works, Electric, Electro-Diesel Locomotive, English Electric, third rail